Performance Assessment of Design-Bid-Build versus to Design-Build Delivery Method in terms of Time and Cost for Construction Project Industries in Saudi Arabia

  • Raddad Musleh

Student thesis: Master's Thesis

Date of Award12 Dec 2018
Original languageEnglish
SupervisorAli Hassen (Supervisor)

Cite this

'