Date of Award | 22 May 2011 |
---|---|
Original language | English |
Supervisor | Umar Al-Turki (Supervisor) |
INTEGRATING PRODUCTION AND MAINTENANCE SCHEDULING UNDER STOCHASTIC PRODUCTION CONDITIONS
Student thesis: Doctoral Thesis