| Date of Award | 3 May 2021 |
|---|---|
| Original language | English |
| Supervisor | Laith Al-Hadidi (Supervisor) |
FUZZY BASED MODELING FOR COST OVERRUN RISK IN SAUDI ARABIA’S CONSTRUCTION INDUSTRY
Student thesis: Master's Thesis