| Date of Award | 22 Dec 2012 |
|---|---|
| Original language | English |
| Supervisor | Ali Hassen (Supervisor) |
EVALUATING THE EFFECT OF DESIGN-BID-BUILD DELIVERY METHOD ON MUNICIPAL PROJECTS IN SAUDI ARABIA
Student thesis: Master's Thesis