Skip to main navigation Skip to search Skip to main content

Toward Construction 4.0: A Hybrid Centralized-Decentralized UML Model for Enhancing Procurement and Inventory in Construction Projects

Research output: Contribution to journal › Article › peer-review

5 Scopus citations

Abstract

In construction projects, delays and budget overruns often stem from inefficient procurement and inventory management practices. This study presents a novel UML model designed to streamline procurement and inventory management processes. The model aims to bridge the gap between conventional and digital construction practices. By integrating centralized control with decentralized decision-making, the model offers a dynamic solution for managing real-time tracking, procurement autonomy, and operational efficiency across multiple projects. Key features include the use of use-case, activity, class, and sequence diagrams to model the material flow, procurement lifecycle, and data-driven decision-making processes. This work is a significant step towards enabling the practical application of Construction 4.0 principles. In addition it sets a new standard in the field, providing a scalable and adaptable solution ready for empirical validation in future case studies.

Original languageEnglish
Pages (from-to)166988-167009
Number of pages22
JournalIEEE Access
Volume12
DOIs
StatePublished - 2024

Bibliographical note

Publisher Copyright:
©2024 The Authors.

Keywords

  • Centralized inventory management
  • Construction 4.0
  • UML model
  • real-time inventory tracking
  • web-based inventory system application

ASJC Scopus subject areas

  • General Computer Science
  • General Materials Science
  • General Engineering

Fingerprint

Dive into the research topics of 'Toward Construction 4.0: A Hybrid Centralized-Decentralized UML Model for Enhancing Procurement and Inventory in Construction Projects'. Together they form a unique fingerprint.

Cite this