Abstract
Abstract: Central tower concentrated solar power (CSP) systems are considered the most mature clean technology to substitute conventional power plants. This work incorporates a simulation and optimization study on a 100 MW central tower CSP plant with 15 h of thermal energy storage in Dubai, UAE. The main performance indicators studied are the capacity factor (CF) and the levelized cost of electricity (LCOE). At first, a parametric study was conducted by varying 10 different operational and geometrical parameters to observe their impact on CF and LCOE using System Advisor Model (SAM) software. The 4 most significant parameters included were hot and cold HTF temperatures, tower height and the heliostat area. A total number of 81 SAM simulations were performed and obtained data sets were used for data regression to find the coefficients of the decision variables in the objective functions to either minimize LCOE or maximize CF. Results showed that the data regression performed accurately with an error of less than 1% compared to the simulated results. The maximum CF was found to be 48.3% where the minimum obtained LCOE value was 13.22 c/kWh. The optimized parameter values can lead to a substantial performance enhancement of 17.8% in the CF and 19.3% compared to the base case scenario obtained by SAM.
| Original language | English |
|---|---|
| Pages (from-to) | 533-545 |
| Number of pages | 13 |
| Journal | Applied Solar Energy (English translation of Geliotekhnika) |
| Volume | 60 |
| Issue number | 4 |
| DOIs | |
| State | Published - Aug 2024 |
| Externally published | Yes |
Bibliographical note
Publisher Copyright:© Allerton Press, Inc. 2024.
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- central tower
- concentrating solar power
- optimization
- power plants
- renewable energy
- simulation
- solar thermal power plants
ASJC Scopus subject areas
- Renewable Energy, Sustainability and the Environment
Fingerprint
Dive into the research topics of 'Simulation and Optimization of 100 MW Central Tower CSP Power Plant'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver