Abstract
This article studies estimation methods for the location parameter. We consider several robust location estimators as well as several estimation methods based on a phase I analysis, i.e., the use of a control chart to study a historical dataset retrospectively to identify disturbances. In addition, we propose a new type of phase I analysis. The estimation methods are evaluated in terms of their mean-squared errors and their effect on the X control charts used for real-time process monitoring (phase II). It turns out that the phase I control chart based on the trimmed trimean far outperforms the existing estimation methods. This method has therefore proven to be very suitable for determining X phase II control chart limits.
| Original language | English |
|---|---|
| Pages (from-to) | 363-379 |
| Number of pages | 17 |
| Journal | Journal of Quality Technology |
| Volume | 43 |
| Issue number | 4 |
| DOIs | |
| State | Published - Oct 2011 |
Keywords
- Estimation
- Mean
- Phase I
- Phase II
- Robust
- Shewhart control chart
- Statistical process control
- Trimean
ASJC Scopus subject areas
- Safety, Risk, Reliability and Quality
- Strategy and Management
- Management Science and Operations Research
- Industrial and Manufacturing Engineering
Fingerprint
Dive into the research topics of 'Robust location estimators for the X control chart'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver