Skip to main navigation Skip to search Skip to main content

Reinforcing long lead time drought forecasting with a novel hybrid deep learning model: a case study in Iran

  • Mahnoosh Moghaddasi*
  • , Mansour Moradi
  • , Mahdi Mohammadi Ghaleni
  • , Zaher Mundher Yaseen
  • *Corresponding author for this work

Research output: Contribution to journal › Article › peer-review

9 Scopus citations

Abstract

Drought assessment is inherently complex, particularly under the influences of climate change, which complicates long-term forecasting. This study introduces a novel hybrid deep learning model, Deep Feedforward Natural Networks (DFFNN), enhanced by War Strategy Optimization (WSO), aimed at forecasting the Standardized Precipitation Evapotranspiration Index (SPEI) for lead times of one, three, six, nine, and twelve months. Key parameters of the DFFNN, including the number of neurons and layers, learning rate, training function, and weight initialization, were optimized using the WSO algorithm. The model’s performance was validated against two established optimizers: Particle Swarm Optimization (PSO) and Genetic Algorithm (GA). Evaluations were conducted at two synoptic stations with distinct climatic conditions in Iran. Results demonstrated that the WSO-DFFNN model achieved superior performance for SPEI 12 (t + 1) with a correlation coefficient (r) of 0.9961 and Normalized Root Mean Square Error (NRMSE) of 0.1028; for SPEI 12 (t + 3) with r = 0.8856 and NRMSE = 0.1833; for SPEI 12 (t + 6) with r = 0.8573 and NRMSE = 0.2203; for SPEI 12 (t + 9) with r = 0.7951 and NRMSE = 0.2479; and for SPEI 12 (t + 12) with r = 0.7840 and NRMSE = 0.3279 at the Chabahar station. Additionally, the WSO-DFFNN model outperformed for SPEI 12 (t + 1) with r = 0.9118 and NRMSE = 0.1704; for SPEI 12 (t + 3) with r = 0.8386 and NRMSE = 0.2048; for SPEI 12 (t + 6) with r = 0.7602 and NRMSE = 0.2919; for SPEI 12 (t + 9) with r = 0.6379 and NRMSE = 0.2843; and for SPEI 12 (t + 12) with r = 0.6044 and NRMSE = 0.3463 at the Anzali station. The results obtained from this study have the potential to improve drought management strategies.

Original languageEnglish
Article number51
JournalApplied Water Science
Volume15
Issue number3
DOIs
StatePublished - Mar 2025

Bibliographical note

Publisher Copyright:
© The Author(s) 2025.

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 13 - Climate Action
    SDG 13 Climate Action

Keywords

  • Deep feedforward natural networks (DFFNN)
  • Evolutionary algorithm
  • Feature selection
  • SPEI
  • War strategy optimization (WSO)

ASJC Scopus subject areas

  • Water Science and Technology

Fingerprint

Dive into the research topics of 'Reinforcing long lead time drought forecasting with a novel hybrid deep learning model: a case study in Iran'. Together they form a unique fingerprint.

Cite this