Planning and scheduling concrete repair work - a case study

Abdulaziz A. Bubshait*, Bassam M. Tahir

*Corresponding author for this work

Research output: Contribution to specialist publicationArticle

Abstract

In this case study the authors demonstrate the importance of recording and studying the details of concrete repair work to enable future projects to be carried out more efficiently with less slippage in the time schedule and therefore less financial damage over the time plants, such as kilns, are shutdown. In this case study, the distress in the concrete pier was apparently due to the twisting of the platform as a result of torsional stress, as well as to diagonal shear cracks in the walls.

Original languageEnglish
Pages363-368
Number of pages6
Volume24
No6
Specialist publicationBuilding Research and Information
DOIs
StatePublished - 1996

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Building and Construction

Fingerprint

Dive into the research topics of 'Planning and scheduling concrete repair work - a case study'. Together they form a unique fingerprint.

Cite this