Abstract
The objective of project scheduling is to determine start dates and the labor resources assigned to each activity in order to complete a project on time. By moving start dates within available slack times and altering labor levels, the daily labor-demand profile can be changed. The objective of personnel scheduling is to determine how many of each feasible workday tour are required to satisfy a given labor-demand profile while minimizing the cost of labor plus overhead. Integrating these two problems permits the simultaneous determination of start dates, labor levels and tours for a minimum-cost and on-time schedule. In this paper, single and multiple resource optimization models and heuristic solution procedures to solve the integrated problem are presented. The heuristic procedure outperformed the non-integrated two-step scheduling procedure by reducing the cost of labor and overhead and performed nearly as well as the optimization procedure.
| Original language | English |
|---|---|
| Pages (from-to) | 473-476 |
| Number of pages | 4 |
| Journal | Computers and Industrial Engineering |
| Volume | 29 |
| Issue number | 1-4 |
| DOIs | |
| State | Published - Sep 1995 |
ASJC Scopus subject areas
- General Computer Science
- General Engineering
Fingerprint
Dive into the research topics of 'Optimization and heuristic models to integrate project task and manpower scheduling'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver