On handling inertia problem of memory charts using break approach

Raja Fawad Zafar, Muhammad Riaz*

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

3 Scopus citations

Abstract

The memory-type control charts are quite efficient in monitoring small and moderate shifts in process parameters. These charts, such as exponentially weighted moving average (EWMA), face the problem of inertia due to the time dependence of statistics. This issue could be solved to some extent using a break at regular/irregular intervals in plotting statistics. We have proposed this method by introducing a break feature at regular intervals, to handle the inertia problem, and found it quite useful for memory control charts. A comparative analysis of the proposal with some existing charts is also part of the study.

Original languageEnglish
Pages (from-to)1708-1715
Number of pages8
JournalQuality and Reliability Engineering International
Volume36
Issue number5
DOIs
StatePublished - 1 Jul 2020

Bibliographical note

Publisher Copyright:
© 2020 John Wiley & Sons, Ltd.

Keywords

  • average run length
  • comparisons
  • control charts
  • efficiency
  • inertia
  • memory structures

ASJC Scopus subject areas

  • Safety, Risk, Reliability and Quality
  • Management Science and Operations Research

Fingerprint

Dive into the research topics of 'On handling inertia problem of memory charts using break approach'. Together they form a unique fingerprint.

Cite this