Impact of inspection errors on the performance measures of a general repeat inspection plan

S. O. Duffuaa*, Mehmood Khan

*Corresponding author for this work

Research output: Contribution to journalReview articlepeer-review

53 Scopus citations

Abstract

Multi-characteristic critical components exist in many systems. Such components may be a part of an aircraft, space shuttle or a gas ignition system. An inspection plan for such components has been proposed in quality control that deals with several types of classification errors made by the inspector. In this paper, performance measures for this plan are defined and the statistical and economic impact of the several types of inspection errors on these measures is investigated. The impact of the errors is studied by conducting sensitivity analysis on the errors utilizing computer software which implements an algorithm that determines the optimal parameters of the model of the plan. The behaviour of the performance measures upon variation in the levels of errors is investigated. The results indicate that these errors have a considerable effect on the performance measures of the inspection plan.

Original languageEnglish
Pages (from-to)4945-4967
Number of pages23
JournalInternational Journal of Production Research
Volume43
Issue number23
DOIs
StatePublished - 1 Dec 2005

Bibliographical note

Funding Information:
The authors would like to acknowledge the support provided by King Fahd University of Petroleum and Minerals, Department of Systems Engineering, in conducting this research.

Keywords

  • General repeat inspection plan
  • Inspection errors
  • Performance measures

ASJC Scopus subject areas

  • Strategy and Management
  • Management Science and Operations Research
  • Industrial and Manufacturing Engineering

Fingerprint

Dive into the research topics of 'Impact of inspection errors on the performance measures of a general repeat inspection plan'. Together they form a unique fingerprint.

Cite this