Abstract
This paper describes a pilot project to evaluate the feasibility of injecting commercial oxygen into Clark Hill Lake. The oxygen was injected 130 ft below the surface at a rate of 90,700 kg/day through a diffuser system extending 610 m across the lake 1. 61 km upstream from the dam. Dissolved oxygen was monitored in each of the seven turbine discharges to evaluate the efficacy of the system in meeting a 6 mg/L dissolved oxygen criterion for the discharges below the dam.
| Original language | English |
|---|---|
| Pages (from-to) | 225-244 |
| Number of pages | 20 |
| Journal | ASCE J Hydraul Div |
| Volume | 108 |
| Issue number | HY2 |
| State | Published - 1982 |
ASJC Scopus subject areas
- General Engineering