Skip to main navigation Skip to search Skip to main content

Hybrid metaheuristic techniques for optimising sugarcane rail operations

  • Mahmoud Masoud
  • , Erhan Kozan*
  • , Geoff Kent
  • *Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

19 Scopus citations

Abstract

Mixed integer programming and parallel-machine job shop scheduling are used to solve the sugarcane rail transport scheduling problem. Constructive heuristics and metaheuristics were developed to produce a more efficient scheduling system and so reduce operating costs. The solutions were tested on small and large size problems. High-quality solutions and improved CPU time are the result of developing new hybrid techniques which consist of different ways of integrating simulated annealing and Tabu search techniques.

Original languageEnglish
Pages (from-to)2569-2589
Number of pages21
JournalInternational Journal of Production Research
Volume53
Issue number9
DOIs
StatePublished - 3 May 2015
Externally publishedYes

Bibliographical note

Publisher Copyright:
© 2014 Taylor & Francis.

Keywords

  • metaheuristics
  • railways
  • scheduling
  • sugarcane

ASJC Scopus subject areas

  • Strategy and Management
  • Management Science and Operations Research
  • Industrial and Manufacturing Engineering

Fingerprint

Dive into the research topics of 'Hybrid metaheuristic techniques for optimising sugarcane rail operations'. Together they form a unique fingerprint.

Cite this