Abstract
The study presents technical, environmental and economic aspects for the selection of viable sites for constructing 10 MW installed capacity grid connected photovoltaic power plants in Saudi Arabia. Available photovoltaic modules are analyzed and one is chosen for the analysis. Meteorological data like global solar radiation, sunshine duration, dry bulb temperature, and relative humidity was used to conduct the feasibility analysis using RETScreen software in terms of energy production, greenhouse gas (GHG) emissions, and financial parameters for the 44 sites. Bisha is found to be the best site for the installation of 10 MW installed capacity grid connected photovoltaic power plant due to highest solar radiation intensity and longer sunshine duration. Both of these factors contribute to higher energy yield and less GHG emissions. On the lower extreme, Sulayel is found to be generating minimum energy from the same installed capacity of PV panels. Finally, it is recommended to commence constructing large grid-connected photovoltaic plant at Bisha with 70% government grant because the electricity export rate in Saudi Arabia is 72.57% cheaper than global price.
| Original language | English |
|---|---|
| Pages (from-to) | 319-329 |
| Number of pages | 11 |
| Journal | Renewable and Sustainable Energy Reviews |
| Volume | 80 |
| DOIs | |
| State | Published - 2017 |
Bibliographical note
Publisher Copyright:© 2017 Elsevier Ltd
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
-
SDG 13 Climate Action
Keywords
- Energy yield
- Feasibility
- Greenhouse gas
- Grid connected
- Photovoltaic
ASJC Scopus subject areas
- Renewable Energy, Sustainability and the Environment
Fingerprint
Dive into the research topics of 'Feasibility study of the grid connected 10 MW installed capacity PV power plants in Saudi Arabia'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver