Abstract
Abbas et al. (Abbas N, Riaz M, Does RJMM. Enhancing the performance of EWMA charts. Quality and Reliability Engineering International 2011; 27(6):821-833) proposed the use of signaling schemes with exponentially weighted moving average charts (named as 2/2 and modified-2/3 schemes) for their improved design structures. A two-sided control structure of these schemes is given in the paper. The computational results in some of the tables of that paper for modified-2/3 are mistakenly given for the one-sided control structure. The corrected two-sided results are provided here. It is noticed that the superiority of the proposed scheme over the classical exponentially weighted moving average chart remains but is less pronounced.
Original language | English |
---|---|
Pages (from-to) | 721-722 |
Number of pages | 2 |
Journal | Quality and Reliability Engineering International |
Volume | 31 |
Issue number | 4 |
DOIs | |
State | Published - 1 Jun 2015 |
Bibliographical note
Publisher Copyright:Copyright © 2014 John Wiley & Sons, Ltd.
Keywords
- CUSUM
- average run length (ARL)
- control chart
- in-control
- out-of-control
- runs rules
ASJC Scopus subject areas
- Safety, Risk, Reliability and Quality
- Management Science and Operations Research