Abstract
The study presents the design and economic assessment of a wind farm of 20 MW installed capacity, located in the Eastern region of Saudi Arabia. The wind farm is designed using 2 MW size wind machines from Vestas at a hub-height of 60 m using specialized WindFarm software. The land area is considered as flat and away from airports, habitats, hospitals, and communication towers. The energy yield and the wake losses were obtained from the energy yield module of the software for the wind farm. On-site data was collected for a period of 1 year and historical meteorological data was obtained from nearby station were utilized in the design of the proposed wind farm. The proposed wind farm could generate 59,037.7 MW h of electricity annually with plant capacity factor of 33.7%, excluding the wake losses of 3.48%. With prevalent wind turbine and other equipment costs, installation, civil works, balance of plants and operation and maintenance costs, the proposed wind farm could produced the energy at US¢ 2.94 per kW h. This study clearly indicates that grid connected wind farms could be developed in and around the measurement site.
| Original language | English |
|---|---|
| Pages (from-to) | 833-838 |
| Number of pages | 6 |
| Journal | Renewable and Sustainable Energy Reviews |
| Volume | 15 |
| Issue number | 1 |
| DOIs | |
| State | Published - Jan 2011 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
ASJC Scopus subject areas
- Renewable Energy, Sustainability and the Environment
Fingerprint
Dive into the research topics of 'Development and economic assessment of a grid connected 20 MW installed capacity wind farm'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver