Abstract
Reliable estimation of sewage flow rates is essential for the proper design of sewers, pumping stations, and treatment plants. The design of the various components of the sewerage system should be based on the most critical flow rates with a focus on extremely low and peak flow rates that would be sustained for a duration related to the acceptable limits of behavior of the components under consideration. The extreme flow conditions and to what extent they differ from the average values are closely related to the size of the community or network, and the socioeconomic conditions. A single pumping station is usually sufficient to pump flow from small community in either flat or non-undulating topography. Therefore, the hydraulic loading on the wastewater treatment plant (WWTP) results from the pumped flow from the pumping station rather than the trunk sewer flow. The intermittent operation of the pumping units further accentuates the sewage hydrograph in the final trunk sewer. Accordingly, the design flow for the various components of the WWTP should be determined based on their relevant flow factors. In this study, analysis of one representative small community out of five monitored small communities in Egypt and the Kingdom of Saudi Arabia is presented. Pumped sewage flow rates were measured and the sewer incoming flows were hydraulically derived. The hourly and daily sewer and pumped flow records were analyzed to derive the relationship between the flow factors that would be sustained for various durations (instantaneously, 1. h, 2. h, etc.) and their probability of non-exceedance. The resulting peaking factors with a consideration for their sustained flow duration and specified probability would permit the design of the various components of the treatment plant using more accurate critical flows.
| Original language | English |
|---|---|
| Pages (from-to) | 537-542 |
| Number of pages | 6 |
| Journal | Journal of Advanced Research |
| Volume | 5 |
| Issue number | 5 |
| DOIs | |
| State | Published - 1 Sep 2014 |
| Externally published | Yes |
Bibliographical note
Publisher Copyright:© 2013.
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 6 Clean Water and Sanitation
Keywords
- Peak flow factors
- Pumping stations
- Sewers
- Small communities
- Wastewater treatment plants
ASJC Scopus subject areas
- General
Fingerprint
Dive into the research topics of 'Design flow factors for sewerage systems in small arid communities'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver