Abstract
Zaman et al.1 proposed an adaptive exponential weighted moving average (AEWMA) control chart (CC) by integrating Hampel function features into the traditional EWMA CC structure. The purpose of this study is to find and fix the inaccuracies in the AEWMA CC by Zaman et al.1. We reproduce the results after rectifying the errors of the AEWMA control chart by applying Monte Carlo simulation. The results of corrected version of the AEWMA CC indicates better performance as compared to Zaman et al.1 The average run length is chosen as a performance measure for comparison reason.
| Original language | English |
|---|---|
| Pages (from-to) | 752-757 |
| Number of pages | 6 |
| Journal | Quality and Reliability Engineering International |
| Volume | 40 |
| Issue number | 1 |
| DOIs | |
| State | Published - Feb 2024 |
Bibliographical note
Publisher Copyright:© 2023 John Wiley & Sons Ltd.
Keywords
- Hampel function
- Monte Carlo simulation
- average run length
- control chart
ASJC Scopus subject areas
- Safety, Risk, Reliability and Quality
- Management Science and Operations Research