Conceptual cost estimating model for water pipeline projects

  • Mohammed Alkhalil*
  • , Sadi Assaf
  • , Walid Abdul Rahman
  • , Mashhour Asfoor
  • *Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

Abstract

Little has been done to model construction costs in the Arab Gulf States; this is especially true with respect to modeling the costs of water projects. This paper develops a linear regression model to estimate the costs of water pipe line projects at the conceptual stage of project design based on data collected from one of the gulf states. The variables of the model were selected based on knowledge of the cost behavior as well as the contribution of the variable to the significance of the model. The model appears to be well-specified after it was verified using data from projects not used in the process of modeling.

Original languageEnglish
Pages (from-to)89-100
Number of pages12
JournalArabian Journal for Science and Engineering
Volume23
Issue number1C
StatePublished - Jun 1998

ASJC Scopus subject areas

  • General

Fingerprint

Dive into the research topics of 'Conceptual cost estimating model for water pipeline projects'. Together they form a unique fingerprint.

Cite this