Case study: Pitting and stress corrosion cracking in heat-affected zone of welded underground 304 stainless steel pipe

Research output: Contribution to journalArticlepeer-review

11 Scopus citations

Abstract

A jacketed underground pipeline made of 304 stainless steel tubing to transport utility water in a petrochemical plant at ambient temperature was perforated after few months of operation. Perforation started preferentially at the outer bottom surface of the pipe in the weld heat-affected zones where the insulating coating was damaged. Detailed microstructural characterization was carried out to determine the cause of failure using optical metallography, x-ray diffraction, scanning electron microscopy combined with energy dispersive spectroscopy, and transmission electron microscopy. Experimental results indicated that the failure occurred by interaction between the outer bottom surface of the pipe and surrounding environment leading to pitting and stress corrosion cracking in the presence of chloride ions. This could have been aided by residual welding stresses and the characteristic low stacking fault energy of the material.

Original languageEnglish
Pages (from-to)1757-1762
Number of pages6
JournalJournal of Materials Engineering and Performance
Volume21
Issue number8
DOIs
StatePublished - Aug 2012

Bibliographical note

Funding Information:
It is a pleasure to acknowledge the continued support of King Fahd University of Petroleum & Minerals and the Saudi Ministry of Higher Education.

Keywords

  • electron microscopy
  • failure analysis
  • stainless steels

ASJC Scopus subject areas

  • General Materials Science
  • Mechanics of Materials
  • Mechanical Engineering

Fingerprint

Dive into the research topics of 'Case study: Pitting and stress corrosion cracking in heat-affected zone of welded underground 304 stainless steel pipe'. Together they form a unique fingerprint.

Cite this