Aircraft maintenance workforce scheduling: A case study

Hesham K. Alfares*

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

46 Scopus citations

Abstract

This paper describes an actual aircraft maintenance labor scheduling study. The study's objective is to determine the optimum maintenance workforce schedule to satisfy growing labor requirements with minimum cost. The main recommendation of the study is to switch from a five-day to a seven-day workweek for aircraft maintenance workers. A new integer programming formulation, used to obtain an optimum seven-day work schedule with no increase in workforce size, is presented. In comparison to the existing five-day schedule, switching to a seven-day workweek is expected to produce savings of about 13 per cent, or $100,000 annually.

Original languageEnglish
Pages (from-to)78-88
Number of pages11
JournalJournal of Quality in Maintenance Engineering
Volume5
Issue number2
DOIs
StatePublished - 1999

ASJC Scopus subject areas

  • Safety, Risk, Reliability and Quality
  • Strategy and Management
  • Industrial and Manufacturing Engineering

Fingerprint

Dive into the research topics of 'Aircraft maintenance workforce scheduling: A case study'. Together they form a unique fingerprint.

Cite this