A chance-constrained model for the operation of the aswan high dam

S. O. Duffuaa*

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

3 Scopus citations

Abstract

This paper analyzes the problem of the operation of Aswan High Dam. A chance-Constrained Model (CCM) is developed for the operation of the Dam. The model optimizes total benefits from the discharged water while incorporating all physical and operational constraints. Zero-order decision rules are used to obtain the model deterministic equivalent. The model operating policy is compared with the current operation policy derived from a heuristic rule and an alternative policy derived from a dynamic programming model developed earlier for the operation of the Aswan High Dam. The chance-constrained approach provides a natural and more flexible model for the operation of the Dam.

Original languageEnglish
Pages (from-to)109-121
Number of pages13
JournalEngineering Optimization
Volume17
Issue number1-2
DOIs
StatePublished - 1 Feb 1991

Keywords

  • Aswan High Dam
  • Chance-constrained programming
  • operational policies

ASJC Scopus subject areas

  • Computer Science Applications
  • Control and Optimization
  • Management Science and Operations Research
  • Industrial and Manufacturing Engineering
  • Applied Mathematics

Fingerprint

Dive into the research topics of 'A chance-constrained model for the operation of the aswan high dam'. Together they form a unique fingerprint.

Cite this