Abstract
This paper analyzes the problem of the operation of Aswan High Dam. A chance-Constrained Model (CCM) is developed for the operation of the Dam. The model optimizes total benefits from the discharged water while incorporating all physical and operational constraints. Zero-order decision rules are used to obtain the model deterministic equivalent. The model operating policy is compared with the current operation policy derived from a heuristic rule and an alternative policy derived from a dynamic programming model developed earlier for the operation of the Aswan High Dam. The chance-constrained approach provides a natural and more flexible model for the operation of the Dam.
| Original language | English |
|---|---|
| Pages (from-to) | 109-121 |
| Number of pages | 13 |
| Journal | Engineering Optimization |
| Volume | 17 |
| Issue number | 1-2 |
| DOIs | |
| State | Published - 1 Feb 1991 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- Aswan High Dam
- Chance-constrained programming
- operational policies
ASJC Scopus subject areas
- Computer Science Applications
- Control and Optimization
- Management Science and Operations Research
- Industrial and Manufacturing Engineering
- Applied Mathematics
Fingerprint
Dive into the research topics of 'A chance-constrained model for the operation of the aswan high dam'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver