Projects per year
Search results
-
Finished
Designing self-assembled water-stable metal-organic framework membranes for separation of dispersed and emulsified oil from
Baig, N. (PI), Aljundi, I. (CoI), Khan, N. A. (CoI), Salhi, B. (CoI), Abdulazeez, I. (CoI) & Abdelnaby, M. (CoI)
1/03/24 → 31/12/24
Project: Research
-
Designing self-assembled water-stable metal-organic framework membranes for separation of dispersed and emulsified oil from
Baig, N. (PI), Aljundi, I. (CoI), Khan, N. A. (CoI), Salhi, B. (CoI), Abdulazeez, I. (CoI) & Abdelnaby, M. (CoI)
1/03/24 → 31/12/24
Project: Research
-
Renewable energy assisted Membrane integrated typical CDI (MCDI) process for the recovery of minerals from seawater.
Salhi, B. (PI), Baig, N. (CoI), Abdulazeez, I. (CoI), Khan, N. A. (CoI), Baroud, T. (CoI) & Mansour, R. (CoI)
1/01/24 → 31/12/24
Project: Research
-
Preparation of 2D composite materials for high performance electrochemical extraction of Lithium and precious metals from brine
Salhi, B. (PI), Baig, N. (CoI), Abdulazeez, I. (CoI), Al-Ahmed, A. (CoI) & Baroud, T. (CoI)
16/02/23 → 31/12/23
Project: Research
-
Two-dimensional hybrid membranes with tunable nanochannels for the ultrafast recovery of precious metals from seawater
Abdulazeez, I. (PI), Aljundi, I. (CoI), Baig, N. (CoI), Salhi, B. (CoI), Chanbasha, B. (CoI) & Hamouz, O. (CoI)
5/02/23 → 30/06/24
Project: Research
-
Functionalized/Intercalated 2D materials-based next-generation membranes for oily wastewater treatment
Baig, N. (PI), Aljundi, I. (CoI), Abdulazeez, I. (CoI), Salhi, B. (CoI) & Abba, S. (CoI)
31/01/23 → 31/12/23
Project: Research
-
Facile Application of Environment-Friendly Reagents for Efficient Cleaning of fouled RO Membranes
Baig, N. (PI), Khan, M. (CoI) & NZILA, A. (CoI)
1/01/23 → 30/06/24
Project: Research
-
Ionic moieties grafted antifouling membranes for wastewater treatment and desalination
Baig, N. (PI), Asrof, A. (CoI), Matin, A. (CoI) & Ahmad, I. (CoI)
1/09/22 → 31/08/24
Project: Research
-
Inorganic-organic hybrid membranes for oily wastewater treatment
Baig, N. (PI), Salhi, B. (PI), Asrof, A. (PI) & Abdulazeez, I. (PI)
15/03/22 → 31/12/22
Project: Research
-
Towards zero liquid discharge technology for treating the reject brine/wastewater from RO plants
Fallatah, W. (PI), Khalifa, A. (CoI), Baig, N. (CoI), Matin, A. (CoI), Abdul Hameed, A. W. (CoI), Lawal, D. (CoI) & Waheed, A. (CoI)
1/07/21 → 1/01/23
Project: Research
-
Glucose Derived Porous Carbon Coated Silicon Nanowires: platform for electrosorption desalination system capacitive deionization (CDI)
Salhi, B. (PI), Abdulazeez, I. (CoI) & Baig, N. (CoI)
1/07/21 → 1/01/23
Project: Research
-
Removal of oil-related organic contaminants from water by using functionalized porous materials
Baig, N. (PI)
1/02/21 → 31/12/21
Project: Research