Projects per year
Projects
- 4 Finished
Search results
-
Finished
Thermo-economic Analysis of Cascade Refrigeration Systems
Qureshi, B. (PI)
1/09/20 → 1/06/22
Project: Research
-
Improvement of a Simplified Model of Water Treatment by Electrodialysis
Qureshi, B. (PI)
15/04/18 → 15/12/19
Project: Research
-
Development and Assessment of a Solar Based ORC-Ejector-Absorption Integrated System for Cogeneration of Power and Cooling
Mokheimer, E. M. A. (PI), Qureshi, B. (CoI) & Yaqub, M. (CoI)
11/04/16 → 10/10/18
Project: Research
-
Performance analysis of a Novel Solar Powered Rankine Engine for Multi-Effect Refrigeration
Mokheimer, E. M. A. (PI), Khan, A. (CoI) & Qureshi, B. (CoI)
1/03/15 → 1/09/18
Project: Research