Projects per year
- 1 - 50 out of 336 results
Search results
-
Finished
CONSULTANCY SERVICES FOR REVISING AND UPDATING MATHEMATICAL MODELS FOR GROUNDWATER & SURFACE WATER RESOURCES IN THE KINGDOM OF SAUDI ARABIA
Memon, A. (PI)
3/12/23 → 4/02/24
Project: Research
-
Environmental Impact Assessment for the Installation of Fourteen Jackets in the Manifa and Abu Safah Offshore Field (BI-12-22000)
Khan, R. (PI)
7/09/23 → 17/08/24
Project: Research
-
Environmental Assessment Study for the Establishment of a Lake in Riyadh (Riyadh Lake Project)
Abouelresh, M. (PI)
5/09/23 → 4/10/23
Project: Research
-
Greenhouse Gas (GHG) Emission Analytics for the Kingdom of Saudi Arabia
Rahman, S. M. (PI)
19/06/23 → 18/06/24
Project: Research
-
AI-Based Nonlinear Control Strategy of DC Microgrid for Net-Zero Energy Buildings
Kassas, M. (PI), Abido, M. (CoI) & Alam, M. S. (CoI)
1/04/23 → 30/09/24
Project: Research
-
Environmental Impact Assessment for the Installation of One Production Deck Module, Four Jackets, and Associated Facilities in the Marjan Oil Field
Devi, S. (PI)
1/03/23 → 31/03/24
Project: Research
-
Artificial Intelligence for Smart-grid Fault Diagnosis
Shafiullah, M. (PI), Abido, M. (CoI), Hossain, M. I. (CoI) & Alam, M. S. (CoI)
1/12/22 → 1/12/23
Project: Research
-
Distributionally Robust Optimization for Power-to-Hydrogen and Carbon Capture System with High-Level Renewable Energy Integration
Al-Ismail, F. (PI), Rahman, S. M. (CoI) & Khalid, M. (CoI)
1/10/22 → 30/09/24
Project: Research
-
-
ENVIRONMENTAL IMPACT ASSESSMENT FOR SAFANIYAH AND MANIFA OFFSHORE TERMINAL AND ASSOCIATED FACILITIES
Khan, R. (PI)
1/08/22 → 1/08/23
Project: Research
-
-
-
Environmental Impact Assessment for Zuluf AM Platforms Upgrade (BI-10-12741) Change Order #01
Joydas, T. (PI)
1/07/22 → 28/02/23
Project: Research
-
Environmental Impact Assessment for the Development of Marjan Gas Lift Facilities (BI-10-14848)
Tiwari, S. P. (PI)
12/06/22 → 11/06/23
Project: Research
-
Environmental Impact Assessment for the Safaniyah Development of Offshore oil and Water Injection Facilities (BI-10-14854)
Ponnambalam, M. (PI)
12/06/22 → 11/06/23
Project: Research
-
An Artificial Intelligence Based Decentralized Voltage Control and Energy Management for Renewable Energy and Storage Devices Integrated DC Microgrid
Al-Ismail, F. (PI), Abido, M. (CoI), Alam, M. S. (CoI) & Hossain, M. I. (CoI)
1/06/22 → 31/12/23
Project: Research
-
EIA for Water Injection Facilities and Oil Pipeline for Manifa
Khan, R. (PI)
17/05/22 → 30/04/23
Project: Research
-
Baseline Terrestrial Environmental Assessment for the Selected Site in Thadiq National Park
Al-Ismail, F. (PI)
11/01/22 → 10/01/23
Project: Research
-
Environmental Impact Assessment for the One Oil Production Deck Module at ABSF 221/231 and its Associated Facilities
Khan, R. (PI)
4/01/22 → 3/04/23
Project: Research
-
Environmental Impact Assessment for One Oil Producer & Two Water Injection Production Deck ?Modules and Associated Facilities in Marjan Field
Tiwari, S. P. (PI)
4/01/22 → 3/04/23
Project: Research
-
Review of the Deliverables of Two Studies on the Assessment of Extreme Water Levels Including Sea-Level Rise in Red Sea and Arabian Gulf
Al-Ismail, F. (PI)
21/12/21 → 11/12/23
Project: Research
-
Consultancy Services to NEOM in the Execution of Fast Track Environmental Technical Services
Joydas, T. (PI)
23/09/21 → 28/12/23
Project: Research
-
Phase-2: Modeling Studies for Suitable Site Selection for the Offshore Recreational Facility in the Vicinity of Juraid island, Arabian Gulf
Joydas, T. (PI)
1/09/21 → 26/06/22
Project: Research
-
Studies for the National Greenhouse Gas Inventory and Climate Change Mitigation.
Rahman, S. M. (PI)
15/08/21 → 15/02/23
Project: Research
-
Enhancing the Gas productivity from Saudi Unconventional Shale Gas Reservoirs
ElHusseiny, A. (PI), Abouelresh, M. (CoI) & Mahmoud, M. (CoI)
1/07/21 → 1/01/23
Project: Research
-
Environmental Monitoring (during construction-phase) for the Piling and Foundation Works of Sheybarah and Ummahat Alshaykh Islands (Package2)
Thazhath, M. (PI)
1/06/21 → 31/07/23
Project: Research
-
Environmental Monitoring (during construction-phase) for the Piling and Foundation Works of Sheybarah and Ummahat Alshaykh Islands (Package#2)
Thazhath, M. (PI)
1/06/21 → 31/12/22
Project: Research
-
Environmental assessment for the selection of prime site to build project
Joydas, T. (PI)
29/04/21 → 31/12/21
Project: Research
-
Environmental Compliance Monitoring and Post-Construction Monitoring for the Safaniya Marine Channel Dredging Project Change Order #01
Thazhath, M. (PI)
18/04/21 → 30/08/22
Project: Research
-
Studies for the National Greenhouse Gas Inventory and Climate Change Mitigation
Rahman, S. M. (PI)
1/04/21 → 30/04/22
Project: Research
-
Model Predictive Control Approach for Optimal Power Dispatch and Duck Curve Handling Under High Photovoltaic Power Penetration
Al-Ismail, F. (PI) & Khalid, M. (CoI)
1/04/21 → 1/04/23
Project: Research
-
EVALUATION OF ROCK TORTUOSITY AND FLUID FLOW USING PULSED-FIELD GRADIENT AND PROPAGATOR NMR TECHNOLOGY
ElHusseiny, A. (PI), Mahmoud, M. (CoI), Adebayo, A. (CoI), Attia, H. (CoI), Khan, R. (CoI) & Mohamed Elsayed, M. (CoI)
1/03/21 → 1/09/22
Project: Research
-
-
Environmental Impact Assessment for the Installation and Upgrading of Facilities in Safaniya Field (BI-12-19000)
Ponnambalam, M. (PI)
31/01/21 → 30/09/21
Project: Research
-
Environmental Monitoring (During Construction-Phase) for the Dredging, Filling & Compaction works of Sheybarah and Ummahat Alshaykh Islands Development
Thazhath, M. (PI)
17/01/21 → 30/04/23
Project: Research
-
Development of Regional Baseline and Monitoring Standards and Conduction of 2020 Surveys for Neom Environment (RFP-100775)
Joydas, T. (PI)
1/01/21 → 31/12/22
Project: Research
-
Enviromental Impact Assessment for Installation and Upgradation of Facilities in Safaniya Field (BI-12-18000 & BI-12-19000)
Tiwari, S. P. (PI)
7/10/20 → 31/12/21
Project: Research
-
Environmental Impact Assessment for the Offshore Developments in Abu Safah and Berri Fields (BI-12-18000)
Pulikkoden, A. (PI)
7/10/20 → 31/12/21
Project: Research
-
Environmental Impact Assessment for the Upgradation of Offshore Platform Facilities in Zuluf Field Area (BI-12-18000 & BI-12-19000)
Joydas, T. (PI)
7/10/20 → 31/12/21
Project: Research
-
Environmental Impact Assessment for the Replacement of 48? CLS-14 Pipeline in Ras Tanura (BI-10-15517)
Khan, R. (PI)
20/07/20 → 31/03/21
Project: Research